Manufacturer for 26″ Industrial rubber glove-rough finish supply for San Francisco
Short Description:
26″ length (65-67cm), black, rough finish, seamless, no cotton lining, left/right hand, 700g/pair, cuff perimeter:61cm, double layer thickness:2.2mm. 50 pairs/case, carton size: 74*36*44cm. Net weight: 35kg/case, gross weight: 37kg/case. It can be suitable used with sand blasting machine operation.
Product Detail
FAQ
Product Tags
Our company promises all users of the first-class products and the most satisfying post-sale service. We warmly welcome our regular and new customers to join us for a better future. Manufacturer for 26″ Industrial rubber glove-rough finish supply for San Francisco, winning customers' trust is the gold key to our success! If you are interested in our products, please feel free to visit our web site or contact us.
26″ length (65-67cm), black, rough finish, seamless, no cotton lining, left/right hand, 700g/pair, cuff perimeter:61cm, double layer thickness:2.2mm. 50 pairs/case, carton size: 74*36*44cm. Net weight: 35kg/case, gross weight: 37kg/case. It can be suitable used with sand blasting machine operation.
FAQ Content
The complete process of how to build a concrete table without any specialty tools. It’s an affordable way to make high end and beautiful furniture. For the complete tutorial and materials list check out DIYPETE.com. Please note that
For more info, project photos, and downloadable plans check out:
http://www.diypete.com/how-to-build-a-concrete-table/
The buffet table I made is 17″wide by 52″ long by 1.5″ thick. Here is a diagram showing how I made the mold.
Cut the bottom of the mold out of melamine using a circular saw
This piece should be the exact width and length you’d like the concrete table to be.
Cut the strips that will border the bottom piece
If you want a 1.5″ thick concrete slab, add 3/4″ to the strips so they are 2.25″ tall. This accommodates for the bottom of the mold.
Assemble the sides of the mold.
Attach using 1 5/8 inch black drywall screws about every 8-12 inches. Drill a pilot hole to help it go in easier. Make sure to drill in from the side as evenly as possible.
Complete the mold
Once assembled, the mold will look like the photo below. You will now have a structure which concrete can be poured in. Note — the actual top of your concrete table will be very smooth because it will cure against the smooth and flat melamine surfaces. The part that you screed and trowel later on will actually be the bottom side. You will flip the mold once the project has cured.
Caulk the creases in your mold.
In the video I use a squeeze tube of 100% silicon caulk. You can also use a caulk gun. Then run a caulk tool to smooth it out. You can also use painters tape to get an even caulk line as pictured below.
Cut Re-enforcement
Once the caulk has cured, go ahead and cut the re-enforcement to size using a bolt cutter. If your table is 52″ long by 17″ in width, cut the metal wiring to about 50″ by 15″. It will leave about an inch of play on each side. Then use rubbing alcohol and a paper towel to thoroughly clean the mold, making sure all sawdust and particles are out of the mold.
It’s time to mix up the concrete. Follow the directs on the bag to see how much water they recommend adding. I like to pour some water into the tub prior to the concrete to minimize dust. Wear a dust mask for this process because the particles are not good to breathe. Mix 1 or 2 bags of concrete at a time. To stir up the concrete use a small shovel or garden hoe. I like to mix it to a peanut butter consistency.
Pack Concrete
Take a handful of concrete (wearing your rubber gloves of course), and start packing the concrete into the mold. *Don’t forget to make sure your work table is as level as possible prior to packing the concrete.
Add Re-enforcement
Once the mold is filled up a little more than half way you’ll want to add the re-enforcement. Simply put the re-enforcement in place and then finish packing the rest of the mold with concrete.
Fill and screed
Fill the mold with concrete until it is full. Take an old 2×4 or straight piece of wood and screed off the excess to level out the concrete. Move the 2×4 in a sawing motion. Continue back and forth across the entire mold (multiple times) and fill in any low spots with extra concrete. Check that your work table is still level. You can always shim if needed.
Remove concrete from the mold
Remove all the drywall screws. Next, take a chisel and slowly pry the wood side away from the concrete. Make sure not to let the chisel (or flathead screwdriver ) touch the concrete.
Flip the concrete and remove top of mold
Slowly flip the concrete. It helps to have two people. I like to take a few shop rags or foam to put under the concrete so when it is flipped vertically there is something for it to rest softly on. Continue flipping the piece and rest it on a few spare boards. Resting it on boards that are evenly spaced will allow the piece to dry thoroughly.
Sand concrete
Use an orbital sander to smooth the piece. You will expose a few more bug holes but that is okay. Run the sander on the sides and corners as well. The top edges will be pretty rough. You’ll fill in the rough area with portland cement after this process.
Apply Sealer
Use a clean rag and get any remaining dust off the concrete. Next, find a new rag and use it to apply a stone or concrete sealer. These can be found at a local hardware store. Read the instructions to find out the best way to apply the sealer. Once the sealer drys I like to wax the piece.
—-
Looking for more DIY videos? Be sure to check out our channel and subscribe for updates! We post a weekly tutorial every Thursday.
Looking for woodworking, concrete working, and other DIY projects plans to follow? You can download plans for free at http://gumroad.com/DIYPETE
Facebook: http://facebook.com/DiyProjectsWithPete
Instagram: http://instagram.com/diypete
Pete Sveen
1627 W Main Street Suite 182
Bozeman, Montana 59715
http://lizardskinsbaseball.com/ Experience the best in bat wrap: DSP has excellent durability, increased shock absorption, and great feel in all conditions. Available in 1.1 mm, .5 mm, or 1.8 mm thickness to suit your personal preference. This amazing technology is only available from Lizard Skins.
About Lizard Skins
Lizard Skins has been in business for the past 20 years manufacturing and distributing bicycle accessories around world. In January of 2011, Lizard Skins officially launched a new product into the baseball industry.
DSP (DuraSoft Polymer) bat wrap was created based off of the highly successful DSP handlebar tape for road bikes. Utilizing our knowledge and experience in developing grips, Lizard Skins designed and created this new innovative bat wrap. Lizard Skins received “Best of Show” award for new product at the American Baseball Coaches Association.
Lizard Skins DSP bat wrap is becoming very popular and our product is different because it is made out of polymer. The enhanced feel, multiple color options and two thicknesses separate our wrap from other bat tape. It works well on all types of aluminum, composite and wood bats. DSP is used in all levels of play from little league to high school, from college to the pros. Make DSP bat wrap your choice for bat tape. Touch it, Feel it, Love it.
Mailing Address
358 Mountain Way Dr.
Orem, UT 84058
USA
Telephone / Fax
Phone: +1-801-229-9099
Fax: +1-801-229-9013
Send us an email at info@lizardskins.com or use the form below:
http://lizardskinsbaseball.com/contact/
Video Produced by http://www.seovod.com